Skip to main content

NASA sets new date for first launchpad test of its mega moon rocket

NASA will have a third go at conducting a launchpad test of its next-generation moon rocket at the Kennedy Space Center in Florida on Saturday, April 9.

This is despite the emergence of another technical issue that NASA is now working to resolve.

NASA's mega moon rocket on the launchpad at the Kennedy Space Center.
NASA’s next-generation “mega moon rocket” on the launchpad at Kennedy Space Center in Florida. NASA / NASA

Two previous attempts over the past week to begin the so-called “wet dress rehearsal” were called off due to the discovery of technical problems, the first one due to a fan issue linked to the rocket’s mobile launcher, and the second due to a stuck valve on ground equipment at the pad.

Recommended Videos

On Thursday, NASA reported the discovery of another issue, this time regarding helium purge pressure on the upper stage engine. After a troubleshooting process, engineers managed to establish a normal helium purge, but they’re continuing to investigate what caused the issue.

All being well, the two-day wet dress rehearsal will begin at the Kennedy Space Center on Saturday at 2:40 p.m. ET.

The exercise will involve NASA engineers filling the powerful Space Launch System (SLS) rocket with fuel before conducting a mock countdown.

If all goes to plan and no more technical issues appear, NASA will be able to prepare for the first launch of the SLS rocket and Orion spacecraft, hopefully in the next couple of months.

The uncrewed Artemis I mission will send Orion on a fly-by of the moon in a comprehensive test of its spaceflight systems. Artemis II will fly the same route but with a crew on board, while the highly anticipated Artemis III mission, currently slated for no earlier than 2024, will put the first woman and first person of color on the lunar surface.

It looks like NASA needs to catch a break with the long-awaited launchpad test of its next-generation rocket. Alongside the technical issues of recent days, the date for the first test attempt also had to be rescheduled after four lightning strikes hit the launchpad’s lightning towers.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
See the polar moon sites where NASA plans to land its astronauts
An artist’s concept of an Artemis astronaut deploying an instrument on the lunar surface.

NASA has updated its list of potential landing sites for the next human visit to the moon, which is planned for 2026. The Artemis III mission will see the first crewed lunar landing since the Apollo era, and the plan is for astronauts to explore the moon's South Pole region where there is thought to be water ice on the lunar surface.

NASA shared a list of 13 candidate landing locations for Artemis III in 2022, but has now updated its list to nine candidates. Some of these were on the list previously, while others have been added such as the Mons Mouton mountain and plateau, which is particularly interesting to scientists because the height of the mountain means that there are permanently shadowed regions nearby. These places, where sunlight never touches, are particularly good candidates when it comes to looking for water ice.

Read more
SpaceX just caught a huge rocket booster for the first time. Now what?
Mechazilla catching Starship booster stage.

It was an astonishing spectacle. A 70-meter-tall SpaceX rocket performing a controlled descent toward a tiny target where two giant mechanical arms were waiting to clasp it just meters above the ground.

Sunday’s bold effort was SpaceX’s first try at “catching” the Super Heavy booster, and to many people’s surprise, it nailed it.

Read more
NASA scrubs Thursday’s launch of Europa Clipper mission to Jupiter moon
The Falcon Heavy rocket on the launchpad at the Kennedy Space Center in Florida.

SpaceX and NASA have called off Thursday’s planned launch of the Europa Clipper mission due to Hurricane Milton, which is heading east toward Florida, home of the Kennedy Space Center.

“Once the storm passes, recovery teams will assess the safety of the spaceport and the launch processing facilities for damage before personnel return to work,” NASA said in a post on social media on Sunday, adding in another message: “Teams have secured the spacecraft in SpaceX’s hangar at NASA Kennedy.”

Read more